Dust in the data center can threaten both mechanical and electrical equipment — a cleaner facility is a more reliable facility.
Dust in the data center can threaten both mechanical and electrical equipment — a cleaner facility is a more reliable facility.
NERC's new computational load standards make large data center sites active grid participants. Facility operators with site load of 50 MW or more face new modeling, monitoring and reporting requirements.
Findings from the Uptime Institute Data Center Security Survey 2026 reveal the impacts of cyber incidents and current assessment practices. They also highlight the challenge of securing OT without interrupting operations
New grid codes will require data center operators to change how their facilities respond to electricity grid faults. This report discusses the key risks and considerations for facility operators.
A power failure in one Google Cloud zone in London disrupted UK banks, couriers and public sector services. Why were they not protected, and who is responsible?
Data center noise is becoming a major source of complaints from nearby residents — particularly low-frequency "infrasound." New research explores the engineering challenges behind the issue and offers ways to mitigate them.
Several manufacturers offer liquid-cooled load banks to simulate IT heat output for DLC commissioning. They differ in form factor and functionality, as well as in how closely they replicate the behavior of liquid-cooled servers.
Superconductivity is still considered an exotic technology, but extreme-density IT will make data center operators take note of this option.
Thailand is the latest country seeking greater oversight of data center projects, with the government pausing construction and approvals while it establishes a unified regulatory framework to manage the sector's rapid growth.
Arc flash risks in data centers using 800V DC strongly depend on architecture — a research paper warns operators that they will need to update arc flash safety procedures to handle DC systems.
Results from Uptime Institute's 2026 Security Survey (n=826), now in its 4rd year, explore major cybersecurity issues facing data centers, as well as the IT and OT systems used to operate critical infrastructure.The attached data files below provide…
How do you cut a grid connection queue that is simply too long? The UK's regulator Ofgem has proposed a large fee to deter and remove non-viable projects from the queue, but the plan may have unintended consequences.
Redundant power and cooling equipment is expected to reduce outages — but by how much? Survey data shows that operators using 2N configurations were up to 64% less likely to report an outage than those using N.
New York's data center moratorium is more than a pause on new projects, it is an attempt to make developers partners in rebuilding the grid — and could provide a model for other governments.
Drones can be used to surveil or potentially attack data centers, but operators have limited options to respond. Aviation and airspace regulations restrict intervention, even when drones are flying over a facility.