filters
Date
all topics
  • AI Workloads
  • Cooling Systems
  • Power Systems
  • IT Systems & Networks
    • IT Systems
    • Networks & Connectivity
    • Cloud Computing
  • Mechanical & Electrical
  • Sustainability
    • Energy Efficiency
    • Reporting & Regulations
    • eWaste
    • Water
    • Low-Carbon Power
  • Resiliency, Risk & Security
    • Availability
    • Risk Management
    • Fire & Life Safety
    • Physical Security
    • Cyber Security
  • Data Center Management
    • DCIM
    • Building & Controls
    • AI & Automation
    • Procedures & Documentation
  • Staff, Skills & Training
    • Training & Professional Development
    • Staffing & Hiring
  • Strategy & Planning
    • Benchmarks & Industry Trends
    • Standards & Metrics
    • Economics
  • Design, Siting, Construction
    • Building Features & Design
    • Site Selection
    • Modernization & Consolidation
    • Prefab & Modular Data Centers
  • Data Center Types & Venues
    • Colocation
    • Enterprise
    • Hyperscale
    • Edge
    • Venue Selection
  • Innovation & Disruption
all types
  • Intelligence
  • Keynote Reports
  • Briefing Reports
  • Data Reports
  • Data Assets
  • Intelligence Updates
  • Intelligence Resources
  • Event Recaps
  • On-Demand Webinars
  • Upcoming Events
  • Discussions
all analysts
  • Andy Lawrence
  • Daniel Bizo
  • Douglas Donnellan
  • Dr. Owen Rogers
  • Dr. Rand Talib
  • Dr. Tomas Rahkonen
  • Jacqueline Davis
  • Jay Dietrich
  • John O'Brien
  • Max Smolaks
  • Peter Judge
  • Rose Weinschenk
Selected Filters
Unlocked content only
2 days ago
Giant data centers: build-out proposals for 2026 track 2025 levels

Giant data center power capacity and investment are at unprecedented levels, with power proposed in the first half of 2026 tracking at 2025 levels.

3 days ago
Uptime Institute DCIM Procurement Guide 2026

Unclear goals and mismatched expectations can undermine DCIM projects if not addressed early. This report provides a roadmap of questions and considerations for buyers and suppliers to align, not just at the outset, but for the long-term.

Survey findings link higher redundancy to lower outage risk

Redundant power and cooling equipment is expected to reduce outages — but by how much? Survey data shows that operators using 2N configurations were up to 64% less likely to report an outage than those using N.

REPLAY | Uptime Institute's 16th Annual Global Data Center Survey Results

Uptime Institute's Annual Global Data Center Survey, now in its 16th year, is the most comprehensive and longest-running study of its kind. The findings in this report highlight the practices and experiences of data center owners and operators in…

29 Jul 2026
AI-accelerated digital twins: lessons for operators

AI-accelerated digital twins are central to many AI factory designs and builds. But despite progress in tackling specific power, cooling and IT challenges, most applications remain unproven beyond initial pilots and lack a clear return on investment.

Uptime Institute Global Data Center Survey 2026

The Uptime Institute Global Data Center Survey, now in its 16th year, highlights the practices, perceptions, intentions and experiences of data center owners and operators across resiliency, sustainability, efficiency, staffing, cloud and AI.

15 Jul 2026
Draft grid rules position data centers as active grid participants

NERC's draft computational load standards could redefine data centers as active grid participants, requiring new modeling, data reporting, operational coordination and disturbance reporting in a bid to protect grid stability.

18 Jun 2026
BESS in data centers: use cases and technologies

Can batteries transform how data centers power AI and connect to the grid? To do so, BESS technologies will need further economic and technical improvements to unlock faster interconnections, cleaner energy and smarter power control.

Hourly-matched net-zero by 2030 was an unrealistic Holy Grail

Operators in most geographies should reconsider hastily-set commitments to reach 24x7 carbon-free energy consumption. Instead, they should adopt more realistic goals.

2 Jun 2026
Is demand response a viable accelerator for grid interconnects?

AI data centers are racing ahead, but the grid isn't keeping up: operators need to rethink how they connect to, generate and manage energy to unlock expansion without overwhelming already strained generation and transmission systems.

20 May 2026
The problem with energy per token

Benchmarks may produce impressive energy-per-token metrics, but real-world AI workloads are bursty; when throughput drops and GPUs sit idle, joules per token can increase. Do not size AI infrastructure for lab conditions — plan for demand.

19 May 2026
NERC alert points to future of grid

An alert from the North American grid connection authority shows that data centers will be treated similarly to generation assets when requesting power connections, requiring operators to share more information and permit operational monitoring.

13 May 2026
Emerging tech: carbon capture at source

By integrating new natural gas electricity generation with carbon capture, operators can safeguard net-zero targets threatened by a reliance on fossil power — but initial adoption will be costly and limited to specific geographic locations.

8 Apr 2026
Vendors gearing up for 800V DC adoption

The topic of direct current (DC) power distribution in data centers is back, and this time it may be different.

REPLAY | Bring Your Own Power and Demand Flexibility May Fall Short for New Data Centers

Delays in grid interconnection continue to slow data center development. "Bring your own power" and demand flexibility are presented as ways to accelerate access to power and meet two to three year deployment targets. We'll briefly discuss the…

Posting discussions is not available for Network Guests