In response to the reliability challenges large data center loads pose to electrical grids, transmission system operators (TSOs), grid authorities and regulators in several jurisdictions around the world are developing new grid connection rules. As the pre-eminent location for large data center infrastructures, the US is leading the charge.

Overlooking the reliability of US grids, the North American Electric Reliability Corporation (NERC) adopted three standards to address identified risks associated with data centers on October 26, 2026. These new reliability standards will transform data centers, referred to as computational load sites (CLS), and their on-site generation systems from passive to active grid participants.

Request an evaluation to view this report

Apply for a four-week evaluation of Uptime Intelligence; the leading source of research, insight and data-driven analysis focused on digital infrastructure.

Posting comments is not available for Network Guests