filters
Date
all topics
  • AI Workloads
  • Cooling Systems
  • Power Systems
  • IT Systems & Networks
    • IT Systems
    • Networks & Connectivity
    • Cloud Computing
  • Mechanical & Electrical
  • Sustainability
    • Energy Efficiency
    • Reporting & Regulations
    • eWaste
    • Water
    • Low-Carbon Power
  • Resiliency, Risk & Security
    • Availability
    • Risk Management
    • Fire & Life Safety
    • Physical Security
    • Cyber Security
  • Data Center Management
    • DCIM
    • Building & Controls
    • AI & Automation
    • Procedures & Documentation
  • Staff, Skills & Training
    • Training & Professional Development
    • Staffing & Hiring
  • Strategy & Planning
    • Benchmarks & Industry Trends
    • Standards & Metrics
    • Economics
  • Design, Siting, Construction
    • Building Features & Design
    • Site Selection
    • Modernization & Consolidation
    • Prefab & Modular Data Centers
  • Data Center Types & Venues
    • Colocation
    • Enterprise
    • Hyperscale
    • Edge
    • Venue Selection
  • Innovation & Disruption
all types
  • Intelligence
  • Keynote Reports
  • Briefing Reports
  • Data Reports
  • Data Assets
  • Intelligence Updates
  • Intelligence Resources
  • Event Recaps
  • On-Demand Webinars
  • Upcoming Events
  • Discussions
all analysts
  • Andy Lawrence
  • Daniel Bizo
  • Douglas Donnellan
  • Dr. Owen Rogers
  • Dr. Rand Talib
  • Dr. Tomas Rahkonen
  • Jacqueline Davis
  • Jay Dietrich
  • John O'Brien
  • Max Smolaks
  • Peter Judge
  • Rose Weinschenk
Selected Filters
Unlocked content only
7 Sep 2026
800V DC arc flash risks will depend on design

Arc flash risks in data centers using 800V DC strongly depend on architecture — a research paper warns operators that they will need to update arc flash safety procedures to handle DC systems.

2 Sep 2026
Giant data centers: build-out proposals for 2026 track 2025 levels

Giant data center power capacity and investment are at unprecedented levels, with power proposed in the first half of 2026 tracking at 2025 levels.

Survey findings link higher redundancy to lower outage risk

Redundant power and cooling equipment is expected to reduce outages — but by how much? Survey data shows that operators using 2N configurations were up to 64% less likely to report an outage than those using N.

25 Aug 2026
AI facility developers advised to take a methodical approach

AI data center projects often run into delays when developers encounter unfamiliar technologies and unexpected technical challenges. Taking a structured, methodical approach can help keep projects on track.

21 Aug 2026
Open-weights models fuel appetite for on-premises AI

Meta's decision to give away its latest large language model challenges the narrative around AI infrastructure.

REPLAY | Uptime Institute's 16th Annual Global Data Center Survey Results

Uptime Institute's Annual Global Data Center Survey, now in its 16th year, is the most comprehensive and longest-running study of its kind. The findings in this report highlight the practices and experiences of data center owners and operators in…

29 Jul 2026
AI-accelerated digital twins: lessons for operators

AI-accelerated digital twins are central to many AI factory designs and builds. But despite progress in tackling specific power, cooling and IT challenges, most applications remain unproven beyond initial pilots and lack a clear return on investment.

Uptime Institute Global Data Center Survey 2026

The Uptime Institute Global Data Center Survey, now in its 16th year, highlights the practices, perceptions, intentions and experiences of data center owners and operators across resiliency, sustainability, efficiency, staffing, cloud and AI.

9 Jul 2026
Data centers face new scrutiny over heat island effect

Data center waste heat does not significantly raise local temperatures, but concerns over the heat island effect demand a robust response that addresses monitoring and mitigation measures.

2026 Data Center Operations and AI Survey [Results and Crosstab files]

Results from Uptime Institute's 2026 Data Center Operations and AI Survey (n=867) focus AI training and AI inference workloads hosted in data centers, as well as how AI workloads are being deployed in terms of data center cooling systems and rack…

REPLAY | Ensuring Operational Readiness for Demands of AI Workloads

In this webinar, we outlined how to build a robust operations and management strategy for AI data centers in a time where extreme power densities, liquid cooling complexity, and rapid hardware refresh cycles demanded a fundamentally different…

23 Jun 2026
A culture of token abundance collides with financial reality

Internal efforts to maximize token use, combined with changes in LLM pricing structures, have rapidly increased enterprise AI spending. Yet there is often limited visibility into whether such expenditures are creating value.

No single hosting model dominates AI training

More data center operators are performing AI training in 2026, and this type of workload continues to be distributed across a wide range of data center venues. No single hosting model has emerged as the default.

27 May 2026
Interactive AI token energy and carbon tool

This tool — to accompany the Uptime report "The problem with energy per token" — explores how energy and carbon per token vary depending on throughput, utilization, power consumption and grid carbon intensity, even when using the same hardware.

21 May 2026
Interactive AI training venue costing tool

The cost of AI training depends on venue choice and infrastructure utilization. This costing tool — to accompany the Uptime report "Where to deploy AI training" — calculates workload infrastructure costs for colo, cloud and enterprise data centers.

Posting discussions is not available for Network Guests